ABOUT US | SERVICES | PROJECTS-WATER | PROJECTS-NON WATER | HOME
PLC Interface Screen

PLC Panel with Motor Starters
pH Control Systems
  • Design, installation and startup of pH control systems at locations in Manhattan to neutralize waste water discharged to the New York City Sewer System

Chiller and Cooling Towers

  • Supplied, installed and calibrated temperature, pressure, flow and level instrumentation at Paramount Groups Manhattan location as well as IBM's Watson Research center
  • Retrofitted existing butterfly valves on cooling towers with new electric operators to replace failed pneumatic units

Semiconductor fabrication plant

  • Numerous calibrations and repair projects at IBM's East Fishkill plant


2600 South Road, Suite 44-215, Poughkeepsie, NY 12601
845.471.2868 • tom@pendragontechnology.com